WHEREAS a pump at the Temagami South Water Plant has failed and we require that a mounting bracket be fabricated and installed in order to remove the pump to ship out for repair; AND WHEREAS OCWA personnel have informed Public Works that it is very important to have this pump pulled out and sent away to be repaired because this could take upwards of 6 weeks or more to get repaired and if the other pump should fail in the meantime, we would not be able to backwash at the plant to make water; AND WHEREAS the Municipality has only one quote for this item, but this item is urgently needed to ensure continued operation of critical infrastructure; NOW THEREFORE BE IT RESOLVED THAT Council authorize the sole sourcing of this service as per the quote provided.